top of page

TEMPORARY ROAD CLOSURE - NORTH WEST POINT ROAD

Public Notice 14/21

June 21, 2021

Residents are advised that the following road will be temporary closed for the reconstruction work to be carried out. Road Closed Signs will be in place for the duration of these reconstruction works.


North West Point Road Closure from 28th June 2021 to 16th July 2021


Access to the Detention Centre and the Dales Road can be made along Murray Road to the Intersection of East West Baseline Road. Access can also be made to the Detention Centre, Dales Road from North South Baseline Road to East West Baseline Road.


Arrangements are being made for the roadworks to get underway and the Shire have commenced preparations of the necessary materials and equipment to be delivered to North West Point Road. Every effort will be made to complete the work within the time frame to have the road reopened to the public as soon as possible.


For further information please contact the Manager Works, Services & Waste Graeme Hedditch on 9164 8300 Ext 230 or Mob: 0439 215 306.

David Price

Chief Executive Officer

©2024 by Shire of Christmas Island

bottom of page